In order to realize continuous pavement of bridge deck by curb slipform paver, it is one of the necessary conditions to ensure the construction machinery and equipment that can pave the bridge deck.  First of all, the lateral formwork on the kerbstone slip-form paver can meet the requirements of the thickness of the thin reinforced concrete surface layer on the bridge deck, and the continuous steel bars, hanging ring steel bars, steel mesh, expansion joints and expansion joints on the bridge are proofread, which may block the slip of the lateral formwork of the kerbstone slip-form paver.  In particular, the blocking and advantage of the transverse complete continuous steel mesh on the bridge deck is that the movable height of the side formwork is only 5cm. Therefore, the side formwork must be a movable lifting type side formwork, which can be lifted to a zero position flush with the extrusion plate.  If there is a lengthened side formwork hanging behind the machine, it must also meet the thickness requirements of the paved bridge deck.

壓縮600.jpg

The bridge deck pavement of some expressways in our country has been damaged in a very short period of time. One of the most important reasons is that the thickness difference between the longitudinal and transverse pavement layers is too large. The longitudinal pre-stressed reverse arch is too large, some of which are more than 5cm and not less than 3-4 cm after pavement.  Transverse in precast reinforced concrete beam, not in the flange plate precast transverse slope, in the beam transverse flange plate between the wet joint, there is a transverse 2-4cm steps, in this case, the beam itself is not balanced in the vertical and horizontal direction, loss of pavement thickness of 2-4cm.  From the perspective of construction control, the minimum pavement thickness is 20cm, which is of great value to ensure the quality of actual bridge deck pavement.


During the construction process, the walking position of the planned kerbstone slipform paver for bridge deck pavement should be reserved, especially for central isolated expressways and grade I highway bridges.  First of all, the crawler of the two-lane large kerb slipform paver cannot travel in the central isolation and emptying position, nor at the outer edge of the main girder flange plate.  Secondly, the bridge engineering should divide the bridge deck paving work into kerbstone slipform pavers for road surface construction. At the same time, the guardrails on the bridge must be made after the kerbstone slipform pavers pave the bridge deck. Otherwise, the bridge railings will block the tracks of the kerbstone slipform pavers and have no paving position.


Previous: No more
Next: No more

Back to list

News you are interested in
主站蜘蛛池模板: 午夜影院伦理片 | 欧洲精品成人免费视频在线观看 | 奇米影视777在线观看 | 东京热av无码精品 | 国产黄色在线免费观看 | 亚洲日本欧美综合在线一 | 日本一级毛片在线播放 | 无码色av一二区在线播放 | 天天综合网网欲色 | AAA级黄色视频 | 国产视频欧美视频 | 日韩黄色小视频 | 亚洲欧洲国产精品久久 | 校花高潮抽搐冒白浆 | 日韩欧美群交P内射捆绑 | 亚洲综合激情五月丁香六月 | 成全动漫视频在线观看 | se五月婷婷 | 久久精品视频偷拍 | 国产精品乱码久久久久久小说 | 国产女人本色高清在线观看 | 强奷乱码中文字幕熟女一 | 麻豆亚洲国产成人精品无码区 | av免费网址在线观看 | 国产精品亚洲第一区焦香味 | 黑人巨大40厘米免费播放 | yellow在线免费观看 | 自慰无码一区二区三区 | 亚洲区综合区小说区激情区 | 亚洲中文字幕精品一区二区三区 | CAOPORN免费视频国产 | 国内精品久久久久久99蜜桃 | 强行扒开女同学腿看屁股眼 | 97色综合 | 久久免费毛片大全 | 一本久久a精品一合区久久久 | 国产又粗又大久久久久久 | 欲求不满放荡的女老板bd中文 | 久久青青精品 | 97青青 | 日本亚洲天堂 |